1. Pre-Installation Preparation
Before installing the slewing drive, personnel must inspect the device for physical damage. Clean the slewing reducer and connecting bracket. Remove impurities such as iron filings, paint, burrs, and welding slag from the supporting surfaces. Use a cleaning fluid such as diesel or gasoline to remove the anti-rust oil from the mounting surface, making sure not to damage the rubber seals.
2. Mounting Bolts
The bolts used during installation must be of the correct specification and performance grade, generally no less than 10.9. Bolts must be fitted with appropriate washers and must not protrude beyond the mounting surface. The length of the bolts threaded into the screw hole is typically twice the nominal bolt diameter. The factory-installed bolts are shipping bolts; after removal, secure the locating bolts with the correct preload.
3. Mounting the Slewing Drive
Attach washers to the bolt heads and secure the bracket and drive with the bolts under no-load conditions. 4. Installation Precautions
Pre-tighten the bolts and washers. Flat washers or spring washers are generally used. Tighten them crosswise, and apply thread-locking glue to the bolt threads. Ensure all bolts are aligned and do not miss any. Avoid bolts that are too long and do not match the thread length. Mark the tightened bolts and joints to facilitate later inspection for looseness. After installation, repaint the finish to improve rust and corrosion resistance.




